Snelson Companies, Inc. worked closely with PG&E to replace a 22 inch pipe installed in 1936 with a new 24 inch gas transmission pipeline to accommodate future In Line Inspections (ILI).
The pipeline reconstruction challenges were enormous including strict environmental restrictions, limited work space and a short, six-month window to complete.
Read more about Snelson’s creative solutions to a challenging gas pipeline replacement project: https://ucononline.com/2019/01/snelson-brotherton-team-find-unique-solution-challenging-hdd-job/